Abstract

The heavy water plant was established under the name of Combinatul Chimic Drobeta, by Decree 400/16.11.1979, under the Inorganic Products Industrial Center (CIPA) Râmnicu Vâlcea. The thermo-electric plant for supplying the heavy water factory with steam was decided to be located in Halânga village, three kilometers from the factory. The process water required for the factory was brought from the Danube, and the hydrogen sulphide used in the process was produced in the plant, through a specific technology, and then compressed, liquefied and stored in special tanks. The works on the heavy water factory at Drobeta Turnu Severin started in 1979, based on a derogatory HCM. The equipment for the heavy water plant was purchased through the Industrial Center for Chemical and Refinery Equipment (CIUTCR). All equipment and facilities that transported hydrogen sulphide had to meet strict quality assurance conditions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.