Abstract
Abstract The standard mixed-integer linear model formulation for the multi-item discrete lot-sizing and scheduling problem (DLSP) is extended by additional partially nonlinear constraints for the case of two-stage batch production. The corresponding feasibility problem is NP-complete in the case of non-zero setup limes. A simulated annealing approach is suggested for computing production schedules on both stages. Numerical results are presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.