Abstract

Purpose: Government of Nepal (GoN) is implementing many small, medium and large type of Irrigation Projects. Sikta Irrigation Project (SIP) is the National Pride Project implemented by the GoN. The command area of the project has 42766.00 ha and beneficiary of the project have 46715 house hold consisting 449588 population of Banke district. The overall objective of the study is to assess the consequences of delay and dispute of the selected contracts of Sikta Irrigation Projecr, Banke , Nepal. Design/Methodology/Approach: Using secondary data of contract the mean planned duration is compared with mean actual duration to analyze delay analysis and Disputes of contract has been interpreted based on standards of contract using content analysis. Findings/Result: The mean planned duration of the contracts under the study is 17.42 month and mean actual time 32.28 month with standard deviation of 7.72 month and mean time variance is 13.46 month behind the schedule and mean time overrun is 14.85 month. Dispute resolution of only Papu costal JV has been analyzed. The contracts need to be rectified in terms of time by proper scheduling and resource leveling based local calendar. Hope the new amendments (PPMO 10th) of time extension will be helpful for timely completion of contracts. Originality/Value: It is an action research to enhance performance of Projects by avoiding Disputes. Paper Type: Analytical Policy Research

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.