Abstract

The present study addresses aspects that must be considered in the sizing of the equipment for material loading and haulage (ore and waste) in an open-pit mine in the Central-West Region of Brazil. This is a complex process because a significant number of variables that limit the activities intrinsic to the loading and hauling operations are involved in the analysis. Such variables are: production rates per unit of time, physical-mechanical characteristics of the material, hauling distances, topography, access design, hauling routes, cycles, and fleet performance (truck, shovel). Additionally, there are other external variables that also condition a normal operation, such as rain, snow, fog and seismic movement. The purpose of this study is to size the fleet of the loading and hauling equipment that fulfills the processing plant requirements in an efficient manner.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.