Abstract

This paper describes a smart load shedding scheme that monitors plant loads, plant generation and generation/utility supply reserve to select the minimum number and lowest priority loads for shedding. The paper first gives an overview of industrial power system dynamics undergoing loss of supply contingencies and existing load shed practices, such as undervoltage, underfrequency, frequency rate of change or contingency based load shedding. It will examine the impact of speed of load shedding on stability. The paper goes on to describe a load shed system that continuously calculates the generation reserve available and shed-able load available in real time by acquiring analog power measurements from generators and utility supplies through IEC61850 GOOSE (Generic Object Oriented Substation Event) messaging. This fast load shed scheme uses the reliability and redundancy of modern Ethernet networks and has simplicity compared to traditional systems. Application solutions are presented and analyzed that handle the required data acquisition using communications and protection devices typically present at an industrial facility, along with means to disseminate load shedding commands with sub-cycle speed to thousands of shed-able loads. Actual performance results from such a load shed system are presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.