Abstract

Korea Atomic Energy Research Institute (KAERI) has developed two methods to handle the problems when a one top PSA model used in a risk monitor was developed that could not match the structure of house trees. These two methods are (1) the development of a special gate called a ‘condition gate’ and (2) the implementation of an If-Then-Else (ITE) logic in the PSA model structure. The proposed methods were applied to an example case, e.g., the station blackout (SBO) accident sequences of a one top PSA model. It was demonstrated that these methods could properly handle the complex condition changes of a system during the SBO accident sequences by using the proposed methods.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.