Abstract

The features of the repair and construction work during the overhaul of buildings are reflected in the development of organizational and technological design documents, which include calendar plans. Organizational and technological models represent the basis for the development and calculation of calendar plans, as well as for determining resource requirements. They for prevention works, the order of their implementation, the nature of the relationship between individual works, reflecting the specifics of the selected technology for the production of work and the features of the simulated object. The scheduling of overhaul works is carried out on the basis of the developed methodology, which allows obtaining rational organizational and technological solutions with a low level of certainty of the initial information. To evaluate the final set of alternative options for calendar plans and choose the best option in accordance with the described methodology, it is recommended to use quasi metric methods. This allows us to lay the foundation for the rhythmic and coordinated work of all units involved in overhaul at the stage of scheduling, as well as to keep track of the possibility of ensuring timely completion of the planned work.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.