Abstract

In designing a construction project, it is early important to consider the purpose and benefit of it uses. Maintenance and reparation work are activities to maintain the function of the building to remain in accordance with the original purpose of the development. The purpose of this research is to establish an execution guidelines for landscape component based on Work Breakdown Structure (WBS). Execution guidelines is a parameter that become the basis rules that should be fulfilled by the designer. The research methodology covers several stages: literature studies and delphi techniques through expert. The results of this study are expected to create implementation guidelines for managing the maintenance and reparation work that can improve the effectiveness and efficiency of building maintenance. Keywords: Project Management, Work Breakdown Structure, Maintenance, Reparation, Specification Determination, Government Building, Green Building

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.