Abstract

The design of mechatronic systems of rail vehicles requires performing verification and validation in the real-time mode. One useful validation instrument is the application of software-in-the-loop, hardware-in-the-loop or processor-in-the-loop simulation approaches. All of these approaches require development of a real-time model of the physical system. In this paper, the investigation of the usage of the model of the locomotive's bogie test rig created in Gensys multibody software has been performed and the calculation time for each time step has been analysed. The verification of the possibility of the usage of such an approach for real-time simulation has been made by means of a simple data transferring process between Gensys and Simulink through the TCP/IP interface. The limitations and further development issues for the proposed approach have been discussed in this paper.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.