Abstract

One primary reason for Nigeria economic underdevelopment is the inconsistency of power supply, and as a result of this fact, immediate attention is required. The criticality of an uninterrupted power supply cannot be overemphasised. Therefore, is this work, a new approach is applied to switch power from a three-phase source to another without human interference. This work presents an automatic three (3) phase power changeover circuit with an alarm that turns power supply from Power Holding Company of Nigeria (PHCN) to a power generator at an instant of interruption or outage from PHCN. The signal is introduced to notify the user of the restoration of the PHCN supply and automatically carries out this process. This process is achieved by using logic control circuits, three-phase sequence monitors, phase(s) failure monitor, overload relay, and contacting relays for practical switching which takes approximate 30 seconds.

Highlights

  • In most developing and underdeveloped parts of the world, for instance, in Nigeria, the supply of electricity from Power Holding Company of Nigeria (PHCN) is unstable [1,2,3,4]

  • One primary reason for Nigeria economic underdevelopment is the inconsistency of power supply, and as a result of this fact, immediate attention is required

  • The signal is introduced to notify the user of the restoration of the PHCN supply and automatically carries out this process

Read more

Summary

Introduction

In most developing and underdeveloped parts of the world, for instance, in Nigeria, the supply of electricity from PHCN is unstable [1,2,3,4]. An automatic changeover switch with an alarm is an electrical device that uninterruptedly observes electrical power supply, notifies the user via the alert, and connects the load to a standby source of electric power if the utility goes off, provided safety measures have been adequately satisfied. This design accurately monitors the incoming supply from the PHCN grid supply before connecting it to the load; the voltage monitor, phase failure, and overload relay are used to carry out this process.

Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.