Abstract
The financial implications of losses in transmission and distribution line conductors are analysed, with the introduction of two new universal parameters, viz. Financial Burden Constant (FBC) and Critical Operating Hours (COH). Each size of a transmission line conductor has a distinctive value of FBC and COH. Techno-economic issues related to transmission systems can very conveniently be addressed using these parameters. The uniqueness of these two constants lies in their ability to combine all the techno-commercial parameters associated with transmission lines and to assist in the comparison of all techno-economic issues from a global perspective. The paper demonstrates how the design and the selection, operation and renovation of the transmission line conductors can be carried out straightforwardly with the help of FBC and COH. These parameters form convenient and simple tools for evaluating transmission and distribution line projects and operating on a global platform.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.