Abstract
Abstract Optimum cut-off grades determination in mining life affects production planning and ultimate pit limit and it is also important from social, economical and environmental aspects. Calculation of optimum cut-off grades has been less considered for mines containing various mineral processing methods. In this paper, an optimization technique is applied to obtain optimum cut-off grades for both concentration and heap leaching processes. In this technique, production costs and different recoveries of heap leaching method directed into modeling different annual cash flows in copper mines. Considering the governing constraints, the Lagrange multiplier method is practiced to optimize the cut-off grades in which the objective function is supposed to maximize Net Present Value. The results indicate the effect of heap leaching process on the optimum cut-off grades of primary and secondary sulfide deposits.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.