Abstract

This paper analysis under the conditions of power penetration of PV power system integrated with distribution power network is 0%, 5%, 10%, 15%, 20%, 24.46%, 30%, 35%, 40%, 50%, 60% and 75% respectively, the effects for common bus-bar load forecasting accuracy. Then, designation for the configuration, NWP solving, real-time data collection and PV power system and its cluster power forecasting of short-term PV power forecasting system. In addition, validation for the accuracy of PV power system cluster short-term power forecasting results, and the results indicate that the proposed system is able to explore and technical adaption for the business demand for operator of power grid dispatch department and PV power system.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.