Abstract

Large quantities of tritium are stored and processed at the Savannah River Site (SRS) Tritium Facilities. In many design basis accidents (DBAs), it is assumed the entire tritium inventory of the in-process vessels are released from the facility and the site for inclusion in public radiological dose calculations. Pending changes in public dose calculation methodologies are driving the need for smaller in-process tritium inventories to be released during DBAs. Reducing the in-process tritium inventory will reduce the unmitigated source term for public dose calculations and will also reduce the production demand for a lower inventory process. This paper discusses process design options to reduce in-process tritium inventories. A Baseline process is defined to illustrate the impact of removing or replacing La-Ni-Al alloy tritium storage beds with palladium (Pd) or depleted uranium (DU) storage beds on facility in-process tritium inventories. Elimination of La-Ni-Al alloy tritium storage beds can reduce in-process tritium inventories by over 1.5kg, but alternate process technologies may needed to replace some functions of the removed beds.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.