Abstract

An asymmetric twin arched tunnel is designed to meet the line development of triple track railway in accordance with ground geological condition and topography in this paper. A partition wall is adopted to support the double arches of the tunnel, and the pilot drift and bench cut method is utilized to preserve the safe excavation of the double arch tunnel in poor rock mass in the paper. The design technique and construction method may guide the driving of such tunnels under similar condition.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.