Abstract

The paper deals with the proposed design of a special repository in Greece, which will store hazardous wastes from the remediation of a metallurgical plant. The repository will be constructed in low depth within the marble formation found in the area, following the room and pillar mining method. The design process regarding the verification of the structural stability of the pillars is presented and aspects of the proposed technical barriers are discussed. (A) This paper was presented at Safety in the underground space - Proceedings of the ITA-AITES 2006 World Tunnel Congress and the 32nd ITA General Assembly, Seoul, Korea, 22-27 April 2006. For the covering abstract see ITRD E129148. Reprinted with permission from Elsevier.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.