Abstract
A new breakwater is on demand to replace the function of an existing steel sheet pile cellular-cofferdam at TPPI Tuban Port of East Java. The existing breakwater has been partially damaged due to severe corrosion and hard attack by monsoon waves. An open frame structure of spun pile vertical-wall breakwater is proposed as an alternative design. The spun pile is a pre-stressed concrete hollow cylinder pile with outer diameter 1800mm and thickness of 200mm. The spun pile lengths vary between minimum 28m to maximum 33m according to the position of hard soil against seabed. The new breakwater is designed to stand against 100yrs RP wave with Hs = 4.7m. Wave height variations around the structure are simulated using Boussinesq Wave module of MIKE21 software, while SAP2000 is used to calculate the strength of superstructure to withstand existing loads and certain load combinations. Plaxis software is used mainly to analyze substructure using existing soil data. This article describes the design process of spun pile vertical wall breakwater, started from loads calculation, then define load combinations, analyze structure in SAP2000, analyze structure in Plaxis, determination of specification and dimension, to design drawings creation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.