Abstract

For the erection of the hypothetical 24-story apartment building several types of construction equipment are discussed. Based on the selection of a climbing crane as a suitable method for erecting components of this building, a detailed analysis is performed on the crane capacities required, crane support frames, and typical floor girders of the structure to support the crane assembly. Additionally, foundation modifications are analyzed and discussed for the initial position of the climbing crane resting on ground level. Further discussions include climbing sequences, lateral restraint, and bracing.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.