Abstract

The Energy Independence, first coal-fired collier built in America in over 30 years, was delivered to the New England Collier Company on August 6, 1983. In her first year of operation she has brought nearly 2½ million tons of coal from the coal fields surrounding Chesapeake Bay to New England power plants at Salem and Brayton Point. This innovative vessel embodies advanced technology in both its power generation and cargo systems, and, as its name implies, represents an important new resource to the New England power consumer. This paper reviews the initial design requirements, the design development, and the trial and post-delivery performance of Energy Independence.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.