Abstract

ABSTRACT In deep-sea mixed transmission mining systems, the mixed transmission hard pipe plays an important role in mineral transport. To speed up the process of connecting the hard pipe, a quick disassembly and assembly system was designed. By model analysis, the key focus of the rapid disassembly and assembly system was the clamp connector. On the basis of vibration theory and finite-element simulations, the connector underwent static and vibration analysis, and the fatigue life was predicted. Finally, laboratory and sea test tests were conducted on the rapid disassembly and assembly system. The quick disassembly and assembly system can realise quick disassembly and assembly under the target working conditions and maintained smooth operation during two 24-h cycle tests.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.