Abstract

Investment of charging facilities is facing deficit problems in many countries at the initial development stage of plug-in electric vehicles (PEVs). In this paper, we study the charging facility planning problem faced by a PEV charging station investor who aims to serve PEV customers with random behaviors and demands (but follow a series of predicted distributions) with lower economic costs of both charging facilities and practical operation. First, we design a multiple-charger multiple-port charging (MCMP) system which provides the capability of scheduling a limited quantity of chargers to serve more PEVs. Second, we further develop a general two-stage stochastic programming model to plan the MCMP system inside a PEV parking lot with consideration of coordinated charging. Third, we classify MCMP stations according to three different connecting patterns between chargers and parking spaces. Fourth, the general planning model is simplified (as a reference) based on the classification. Finally, we complement our analysis through case studies.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.