Abstract

At present, in the domestic condom manufacturing industry, the method of the pin hole detection of the condom is the electric test, and because of the uncertainty of the attitude before the electric test of the condom, the automatic electric test can not be carried out. In order to solve the attitude and order of the condom, the automatic electric test is realized. In this paper, a transfer system based on the Mitsubishi PLC controller is put forward based on the physical property of the condom, and the mutual action of the various sensors and the air cylinder is used to achieve the aim of the research. The delivery system solves the problem of disorder and overlap of condoms, realizes automatic detection, reduces labor cost, and provides an effective system for the transportation of flexible materials.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.