Abstract

In recent years, the Washington State Department of Transportation (WSDOT) has deviated from its normal policy of correcting frost heaving and thawing problems on state highways. WSDOT’s traditional approach for frost design rehabilitation has been to place a crushed stone base at least half the depth of the frost penetration. This approach has served WSDOT well on the majority of its highway system; however, other measures were sought to mitigate extensive frost-related problems in northeast Washington. To isolate the flow of water from the pavement structure, a capillary break using a free-draining aggregate or “rock cap: layer was used on projects during the last 5 years. The rock cap material was a maximum 75-mm (3-in.) material with 0% to 15% passing a 12.5-mm (1/2-in.) sieve. The open-graded nature of the rock cap provides a positive drainage blanket so that excess water can be eliminated from the roadway structure, and thus eliminates frost-heaving and thaw-weakening problems. However, constructing with a large stone material presents special construction considerations, particularly pertaining to the stability of the material. WSDOT’s construction experience is detailed, and rock cap performance in Washington State is summarized.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.