Abstract
Increasing electricity costs coupled with lower prices for some metals such as platinum group metals require a reevaluation of the operation of grinding processes. Demand side management (DSM) has received increasing attention in the field of industrial control as an opportunity to reduce operating costs. DSM through grinding mill power load shifting is presented in this paper using model predictive control and a real-time optimizer. Simulation results indicate that mill power load shifting can potentially achieve cost reductions of $9.90 per kg of unrefined product when applied to a run-of-mine (ROM) ore milling circuit processing platinum bearing ore. DSM is however still not economically feasible when there is a demand to continuously run the milling circuit at maximum throughput.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.