Abstract

This contribution deals with the optimal placement of the decoupling capacitances on the gridded power delivery network of a multichip assembly with interposer. The optimization is performed by means of a nature-inspired algorithm of the genetic class. Different placement strategies are considered and compared. The cost function is based on the evaluation of the input impedance looked into the power and ground rails of the power distribution network and its comparison with a user-defined mask.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.