Abstract

Capital costs, fuel, operation and maintenance (O&M) costs, and electricity prices play a key role in the economics of nuclear power plants. Often standardized reactor designs are required to be locally adapted, which often impacts the project plans and the supply chain. It then becomes difficult to ascertain how these changes will eventually reflect in costs, which makes the capital costs component of nuclear power plants uncertain. Different nuclear reactor types compete economically by having either lower and less uncertain construction costs, increased efficiencies, lower and less uncertain fuel cycles and O&M costs etc. The decision making process related to nuclear power plants requires a holistic approach that takes into account the key economic factors and their uncertainties. We here present a decision-support tool that satisfactorily takes into account the major uncertainties in the cost elements of a nuclear power plant, to provide an optimal portfolio of nuclear reactors. The portfolio so obtained, under our model assumptions and the constraints considered, maximizes the combined returns for a given level of risk or uncertainty. These decisions are made using a combination of real option theory and mean–variance portfolio optimization.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.