Abstract

This paper considers deadline dependent pricing and its impact to datacenter net profit optimization. We formulate the problem by jointly maximizing total revenue as a function of individual job deadlines and minimizing electricity cost through job scheduling over different time and locations. These two complementary objectives-the maximization of revenue and the minimization of cost-are mutually-dependent due to the coupling of job completion time and scheduling decisions. Lever-aging a new approximation method for job completion time, we develop two low-complexity, distributed algorithms for the net profit optimization. Through numerical evaluations, we show the efficacy of the proposed algorithms as well as the net profit improvements.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.