Abstract
The minimum unfolding factor necessary to reduce the critical path time of the data-flow graph to less than or equal to the required iteration period of the associated algorithm is determined. Minimizing the unfolding factor is important because the time complexity for scheduling and allocation increases linearly with the unfolding factor. An iterative unfolding algorithm that calculates the minimum unfolding factor necessary to achieve a given sample rate is introduced. The unfolding factor can be further reduced to achieve a given sample rate, in many cases with the use of retiming. The algorithm can be utilized to preprocess a data-flow graph prior to resource scheduling and allocation. >
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.