Abstract

Abstract An electromechanical method is proposed to avoid peak dynamic loads in a steady state, the condition of smooth start and emergency stop, as well as correction of the scraper conveyor productivity depending on the load flow level of the blasting combine, which will increase the reliability and reduce the energy and metal consumption of the transport link of the mining complex.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.