Abstract

There are generally large errors between forecast and actual values of new energy power in the dayahead stage, which may cause curtailment of wind power and photovoltaic power due to the insufficient reserve of provincial power grids in the intra-day stage. Therefore, multi-time scale multi-province coordinative day-ahead and intra-day scheduling model considering the uncertainty of new energy prediction is proposed in this paper: Considering the possible errors of new energy prediction in the day-ahead stage, a multi-provincial robust unit commitment model is established to provide sufficient reserves for new energy consumption; the tie-line scheduling and unit output in the intra-day stage according to ultra-short-term predicted data of new energy is adjusted to establish an intra-day scheduling model considering tie-line power flow control. The proposed model is applied to the actual calculation example in a certain region of China, the results of which show that the model can give play to the mutual aid of interconnected power grids and effectively improve the consumption level of new energy.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.