Abstract

A scheduling method for determining the critical path in linear projects is presented, that takes into account maximum time and distance constraints in addition to the commonly used minimum time and distance constraints. The maximum constraints, though often present in the specifications of a project, are not considered during the planning procedure, since no method existed to enable scheduling with them. The proposed method builds on the concept of the maximum constraints and expands on the necessary background for their implementation into the schedule. The introduced critical path algorithm allows for grouping linear activities into four categories regarding their critical status and their ability to influence project duration. The method is applied to a low‐pressure pipeline construction project and the results are presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.