Abstract

AbstractWith a catchment area of approx. 269 km2, the waste water treatment plant in Wuerzburg is one of the largest purification plants in Bavaria, Germany. Due to the limited capacity of the plant, just under half of the sludge that was produced could be digested. Consequently, the decision was made to construct two new digesters with an additional volume of 5,000 m3 each. (© DSI)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.