Abstract

This paper introduces a new importance measure, the cost-related importance measure (CIM), for system cost-risk analysis. CIM responds to the need of the analyst to get information about the importance of proposed changes that affect component properties and multiple basic events. Different from other basic importance measures, the proposed CIM takes into account cost issue, which can consider both structure importance and cost-efficiency importance. CIM is additive, which means the groups of basic events or parameters are the sum of the individual CIMs. We discuss the relationship between CIM and other basic importance measures, and find out that the differential importance measure (DIM) is the special case of CIM when taking certain cost function. Two examples are used to demonstrate the evaluation of CIM at both the basic event and the parameter level. And in the second example, we discuss the method for dealing with the ignored basic event.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.