Abstract

Port design and approaches are usually carried out using real-time computer simulation methods for ship manoeuvring. So-called ship real-time simulation methods are relatively expensive, especially in terms of survey time. Several real-time simulation scenarios carried out by masters and pilots are usually performed, with several simulation attempts in each scenario. Each such attempt can last up to one hour, which, with a large number of scenarios, prolongs the research and increases its cost. Particularly time-consuming is the repetition of many scenarios with alternative solutions for infrastructure development and in various hydrometeorological conditions. To reduce the time-consuming of the tests, a new two-stage method was used to design the target approach on the modernized Port of Ustka. In the first stage, the simulations were carried out with significantly reduced floating navigation marking, and in the second stage with the target marking. Moreover, the so-called “Soft-Bank” method was introduced, i.e., the effects of a collision with the seabed and infrastructure were excluded. Such a solution leads to significant time benefits in conducting research and at the same time does not reduce confidence in the results obtained.

Highlights

  • The major aim of a case study [1] which is the illustration to presented Soft-Bank method was to design the new approach and breakwater solution for a general cargo ship of the following parameters: L = 133 m, B = 20 m, T = 7.9 m utilizing real-time ship manoeuvring simulation methods for the modernized Ustka Port located in the middle of the Polish coast

  • The presented study showed the applicability of real-time simulation methods for design the new ports, their approaches, and the breakwater layouts

  • The “Soft-Bank” method developed and presented could let to reduce almost 50% workload for conducting the simulation runs by reducing the number of possible port infrastructure solutions

Read more

Summary

Introduction

The major aim of a case study [1] which is the illustration to presented Soft-Bank method was to design the new approach and breakwater solution for a general cargo ship of the following parameters: L = 133 m, B = 20 m, T = 7.9 m utilizing real-time ship manoeuvring simulation methods for the modernized Ustka Port located in the middle of the Polish coast. The conditions of safe operation of port for the maximal vessel will be established. The main aim of the Ustka Port case study that was concerned with: iations. Determination of: average ship dimensions and its characteristics like the power of the main engine, rudder type and its area or power of bow thruster, safety waterway parameters needed for the safe operation of maximal ships, turning place diameter concerning its shape

Objectives
Methods
Discussion
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.