Abstract

In recent times, the demand for electricity has increased in the world for many reasons including the increase in the population. Power can obtained from many sources but clean energy is the focus of scientific research in the world now due to increased gas emissions and trying to find a cheaper alternative to oil derivatives. In this research, the electricity generation from low-altitude systems and the potential profits and costs of the project were assessed. The Ramadi barrage across the Euphrates at Anbar province of Iraq was taken as a case study. The number of turbines to be developed in the study area is 6 Kaplan turban. The amount of energy to be produced from the Ramadi barrage would be between 12-24 megawatts at a total cost of 4,309,427$ with total benefits 7,999,018 $ /year.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.