Abstract

In this paper, we consider a cost optimisation analysis of M/G/1 retrial queue with k optional phases of service under multiple working vacations and vacation interruption, where each phase consists of an optional re-service. An arriving customer may balk the system at some particular times. When the orbit becomes empty at regular service completion instant, the server goes for a working vacation. During a working vacation period, the server works in lower service rate. The normal busy server may get to breakdown and the service channel will fail for a short interval of time. We analyse the steady state probability generating function for the system size by using the supplementary variable method. Some important system performance measures are obtained. Finally, some numerical examples and cost optimisation analysis are presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.