Abstract

The construction of new shipyard in the Cilacap area is one of the best ways to reduce the accumulation of vessels. The construction of shipyard has many risks, one of the risks that can occur during the construction of the shipyard is in terms of cost and time. Project scheduling is a tool to make sure the project finished on time. This paper discusses project scheduling and cost calculation using Critical Path Method (CPM) and Program Evaluation Review Technique (PERT) method for Graving Dock project development in Cilacap. Project scheduling is useful to indicate the relation of each activity to another. This paper will discuss the critical activities during Gravity Dock development and the duration for the whole project using CPM. The next step is to determine the probability of the completing project that can be finished within the time frame using PERT. Based on the CPM analysis, the probability of Graving Dock project can be finished in 204 days is 79,81 %. The total cost for Graving Dock project in Cilacap is Rp. 6.486.122.769.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.