Abstract
Corrigendum to ‘‘Inducing-objective-function-based method for long-term SCUC with energy constraints’’ [Int. J. Electr. Power Energy Syst. 63 (2014) 971–978] Yang Bai , Haiwang Zhong , Qing Xia , Yaozhong Xin , Chongqing Kang a a State Key Lab of Power Systems, Dept. of Electrical Engineering, Tsinghua University, Beijing 100084, China b State Grid Corporation of China, West Chang’an Street, Beijing 100031, China
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Electrical Power & Energy Systems
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.