Abstract
As one of national important engineering, South-to- North Water Transfer middle line crossed the Beijing subway route 1. Various controlling technologies of deforming were applied during construction of water tunnel in order to control the deformation of the existing subway tunnel. At the same time, automatic monitoring technology was applied too. By the system analysis of monitoring data and controlling measures, the rule of structure deformation is concluded and the validity and fitness of controlling measures are validated. At last, it is useful experience for similar engineering.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.