Abstract

This study intends at pinpointing factors that contribute to setbacks in building projects in the UAE. For that purpose, a designed questionnaire study was supplied to professional engineers in the UAE construction industry. A literature analysis was also performed, in which 106 elements were discovered. The discoveries suggested that the leading postponement risk reasons are as follows: variations of orders; interruptions in decision-making and endorsement bycustomers ; contractors’ funding problems; inadequate site administration and control by contractors; and inadequate management of project development. These conclusions can aid the construction industry by providing enhancements to the guidelines to encounter market requirements; guiding proprietors in decision making and dropping change order appeals; supporting contractors in preparation; handling the project and risks (internal or external) when assessing and organizing; and assisting professionals to utilize project management methods through construction, permitting adequate time to construct and organize the building records.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.