Abstract
This study intends at pinpointing factors that contribute to setbacks in building projects in the UAE. For that purpose, a designed questionnaire study was supplied to professional engineers in the UAE construction industry. A literature analysis was also performed, in which 106 elements were discovered. The discoveries suggested that the leading postponement risk reasons are as follows: variations of orders; interruptions in decision-making and endorsement bycustomers ; contractors’ funding problems; inadequate site administration and control by contractors; and inadequate management of project development. These conclusions can aid the construction industry by providing enhancements to the guidelines to encounter market requirements; guiding proprietors in decision making and dropping change order appeals; supporting contractors in preparation; handling the project and risks (internal or external) when assessing and organizing; and assisting professionals to utilize project management methods through construction, permitting adequate time to construct and organize the building records.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Engineering and Advanced Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.