Abstract

The author describes the construction of a 660 metre tunnel through the Penmaenbach headland, forming part of the A55 improvement scheme. The headland is formed of intrusive rhyolite rock of Ordovician age, and is known to be highly fissured. A non electrical low vibration blasting technique (nonel) was utilized (see IRRD 261321). At the end of the tunnel a short length of soft ground and mixed faced working was driven by multiple headings using a labour intensive arch supported system. The construction of the two tunnel portals is compared. The West portal is formed square into a steep rock face exposed after removal of an extensive talus slope. Drilling was carried out using a holman voltac tracked drill rig and rock was cleared after blasting using a hydraulic backactor. The East portal formed at a shallow skew angle required supported open cut excavation designed to retain the hillside. (TRRL)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.