Abstract
This study aims at identifying the risk factors affecting cost overrun in building construction projects in the West Bank in Palestine from contractors’ viewpoint. To do so, 31 contractors working on building construction completed a structured questionnaire survey. Forty factors were identified through a literature review. These factors were grouped into five groups: cost estimating, construction items, construction parties, environmental, and financing. The results indicated that the top five affecting factors are fluctuation in currency exchange rate, project financing, contract management, level of competitors, and cost of materials. The findings can support the government in improving the regulations to meet the construction market needs, owners in planning and designing and evaluating policy, contractors and managers in planning and taking external and internal risks when costing and scheduling contracts, consultants in applying comprehensive contract information, and workers in conducting their day...
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: The IES Journal Part A: Civil & Structural Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.