Abstract

A new airport is under construction off the coast of the present Tokyo International airport to cope with the increase in passengers and to reduce the noise problem. The construction site is located on the place which has recently reclaimed by soft clay with high water content.The paper describes the settlement of the ground treated by band drain, the design method for structures under ground settling by consolidation and the behaviour of braced excavations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.