Abstract

In this paper, the theoretical basis for construction labor productivity measurement is presented. In particular, the theoretical basis for baseline productivity measurements is developed by examining a productivity database consisting of 23 projects involving masonry construction. An important hypothesis is presented showing that as the design becomes more complex, the baseline productivity worsens. It is also hypothesized that higher values of the coefficient of variation indicates a higher variability in management and craft skills and in the use of technology. Two measures are proposed to measure the performance of individual projects: the disruption index and the project management index. These two measures identify the best and worst performing projects. Cumulative probability distributions of the disruption index and the project management index were also developed to evaluate the 23-project database and compare it with other databases. The hypotheses developed from the 23-masonry project database were tested against an eight-project database of concrete formwork and a 12-project database of structural steel erection. Strong support for each hypothesis was found using the two additional databases.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.