Abstract

Introduction: High Alpine regions show a great potential for solar photovoltaic electricity production in winter due to the reflective properties of snow and the larger number of sun hours compared to lower urban and peri-urban regions. In countries with a pronounced deficit in domestic electricity production such as Switzerland, utility-scale projects of Alpine-PV power plants are now flourishing. The harsh environmental conditions and the complexity of the high-Alpine topography however challenge the conventional design practices. In this context, the main question the article addresses is the representation of test-scale measurement in the performances of Alpine-PV, utility-scale power plants.Methods: This article focuses on the comparison between long term tests and the first Alpine-PV utility-scale power plant in Switzerland.Results: The results show that the main performance indicators such as the Alpine-to-Midlands final yield ratio or the winter fraction, do scale. However, absolute final yield values are consistently lower at the utility scale.Discussion: The paper discusses the possible impacts of the complex Alpine topography as constraint for the design of the larger extent of utility-scale power plants as well as the influence of scale on the snow induced losses.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.