Abstract

ALBA will be a third generation synchrotron light facility to be built near Barcelona (Spain). The design phase of ALBA is almost completed and the first components are ready to be ordered. Commissioning of the storage ring is foreseen to start at the end of 2008. The circumference of the storage ring of ALBA is 268.8 m and it will be divided into 16 vacuum sections by ultra high vacuum (UHV) gate valves. The vacuum chamber will be made of stainless steel with vertical aperture of 28 mm and 72 mm width. The vacuum chamber will be connected to an antechamber with a slot of 10 mm height. The antechamber will have the crotch absorbers which will absorb the unwanted synchrotron radiation. The pumping will be by sputter ion pumps (SIP), NEG pumps and titanium sublimation pumps (TSP), with an overall pumping speed from SIP of 57,400 l/s. This will maintain an average dynamic pressure of around 1 × 10 −9 mbar to achieve a beam lifetime >15 h at the designed current.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.