Abstract

For the automatic control systems with tight real time, construction of feasible schedules under the given job execution deadlines was considered, and in addition the constraints on processor memory were taken into consideration. Two methods were developed to solve this problem. The first method is based on reducing the original problem to the search of a multi-commodity flow in a special network. The second method offers a fast algorithm to determine a feasible schedule for the uniprocessor case.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.