Abstract

The procedure of load transition in a dual-active-bridge converter is expected to be fast and spike free. To achieve such a goal, the total required adjustment of phase-shift angles should be assigned to different switch arms properly. This study discusses all possible combinations of two switch arms and their related phase-shifts, which could result in several different solutions. By forcing a zero algebraic variation of the volt-second product, all solutions can keep the volt-second balance of the power inductor so that no risk of magnetic saturation in the transient state exists. The possibility of temporal overshoot current can be checked by verifying the monotonicity of the intermediate volt-second product. A comparison of all solutions is made to give a suggestion for their feasibility. Experimental tests are included at last which validated the theoretical analysis.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.