Abstract

The methodological and practical approaches to realizing an iterative multiple-criterion analysis for evaluating the decommissioning costs of the power-generating units of nuclear power plants and the optimal structure of the analysis using information technologies are examined. The objective prerequisites which have been established and facilitate the development and use of decommissioning simulation models in practical work are analyzed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.