Abstract
Buffer capacity allocation problems for flow-line manufacturing systems with unreliable machines are studied. These problems arise in a wide range of manufacturing systems and concern determining buffer capacities with respect to a given optimality criterion which can depend on the average production rate of the line, buffer cost, inventory cost, etc. Here, this problem is proven to be NP-hard for a tandem production line and oracle representation of the revenue and cost functions, and NP-hard for a series-parallel line and stepwise revenue function.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Mathematical Modelling and Algorithms in Operations Research
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.